ŠKODA Flagship: Production Starts on a redesigned ŠKODA Superb

Posted on 30. May, 2013 by in Volkswagen Canada

News

Add to File Folder

• Top indication with new demeanour now rolling off a Kvasiny prolongation line
• Extensive modernization and enlargement of a plant
• Superb and Superb Combi only got even better

ŠKODA started prolongation currently on a all new Superb tavern and combi during a Kvasiny plant. The automobile manufacturer has modernized and stretched a Kvasiny prolongation comforts to accommodate a prolongation of a new tip model.

“We have once again achieved a success in prolongation engineering,” says Michael Oeljeklaus, ŠKODA Board Member for prolongation and logistics. He continues, “The whole group from production, planning, apparatus construction and logistics have finished a illusory pursuit entrance together to work on a fourth start of prolongation this year alone.”

In tie to a prolongation launch of a new Superb, a public and physique emporium have been modernized with new apparatus and tools. The logistics routine has also been optimized: The car axles are now being delivered directly to a prolongation lines by a ‘Just-in-Sequence’. The manufacturer has also designed new exam rigs for a final assembly, such as a exam complement for car geometry.

The redesigned ŠKODA Superb is now being constructed during a modernized Kvasiny plant. The brand’s flagship boasts appealing new ŠKODA pattern elements, a uninformed interior and softened technical features. The expenditure and emissions of a engine operation have forsaken by adult to 19%. The marketplace launch for both a tavern and combi is set for a finish of June.

Kvasiny is one of 3 ŠKODA prolongation comforts in a Czech Republic, where about 4,500 people are employed. Alongside a Superb, a ŠKODA Roomster and ŠKODA Yeti also hurl off Kvasiny’s prolongation lines. A sum of 153,700 vehicles were constructed there in 2012. In a march of expanding a trickery and relocating a Roomster from Vrchlabí to Kvasiny, a new logistics gymnasium and public line were built for a Roomster in Jan this year. In addition, a pivot public started in Kvasiny. A new gymnasium for framework prolongation is designed for after this year.

Tags: ,

Comments are closed.